Stearic Acid Series

  • 0
  • 0

Construction Precautions for Foam Lightweight Soil

The European Commission has submitted to member states a new draft of sanctions against Russia, including an oil embargo. Some member states that rely heavily on Russian energy sought exemptions.  

Western media reported that the European Commission draft of the sixth round of sanctions against Russia includes within six to eight months gradually banning oil imports from Russia, but allowing Hungary and Slovakia to extend the transition period for several months; The Russian Savings bank and other large financial institutions on the sanctions list.  

The European Union has imported 44 billion euros of fossil fuels from Russia since Russia launched its special military operation against Ukraine in late February, according to Finland's Energy and Clean Air Research Center.  

The Institute for European and Global Economics in Brussels estimates that the European Union currently consumes about $450 million worth of Russian oil a day.  

Among EU members, landlocked Hungary and Slovakia, which import most of their oil from Russia, cannot quickly find alternative supplies.  Slovakia says the transition will take years.  Some officials believe Bulgaria and the Czech Republic may also seek to opt out of oil sanctions against Russia.

Affected by the ever-changing international situation, the supply and prices of international bulk Foam Lightweight are still very uncertain.


The filling elevation of the foam light soil with different strengths shall be constructed in strict accordance with the design requirements. The anti-seepage geomembrane on the top of the foam light soil subgrade shall be laid under the metal mesh, and the lap joint shall be thermally welded, and the lap width shall not be less than 10cm. 

When laying, it should be flattened and tightened to avoid local rolling up. If necessary, U-shaped nails can be used for anchoring. When laying the metal mesh, U-shaped nails should be used for anchoring, the longitudinal anchorage spacing is 2m, and the transverse anchorage spacing is 1.0m. The plane position of the metal mesh should be overlapped and overlapped, the width of the overlap should not be less than 5cm, and the overlap should be bound with plastic buckles and anchored with U-shaped nails.


Before the light soil is poured, according to the boundary conditions of the construction site, the pouring area and the pouring layer are first divided, and the base is checked to ensure that the base is free of debris and water, and that the base elevation meets the design requirements and should meet the following requirements:

1) The top surface area of a single pouring area should not exceed 400m2.

2) The length in the long axis direction of a single pouring area should not exceed 20m.

3) 1.8cm thick wooden plywood is used to support the spacing and joints in the adjacent pouring area. The wooden plywood is a temporary support template and is also used as a deformation joint filling and must not be removed.

4) The thickness of the single-layer pouring layer should be controlled within the range of 0.3-1.0m.

5) The thickness of 0.8m at the top of the light soil subgrade must be used as an independent single-layer pouring layer, and the layer should be poured at one time in each pouring area.


Construction Control Points

1) For the adjacent pouring layers in the same section, when the temperature during the construction period is not lower than 15℃, the shortest pouring interval can be controlled by 8 hours; otherwise, the pouring interval should not be less than 12 hours.

2) The pouring construction time of the pouring layer in a single pouring area of foam light soil should be controlled within 2 hours.

3) It should be poured from one end to the other end along the long axis of the pouring area; if more than one pouring pipe is used for pouring, it can be poured side by side from one end, or the diagonal pouring method can be used.

4) During the pouring process, when the pouring pipe needs to be moved, it should be moved back and forth along the direction in which the pouring pipe is placed, and it is not appropriate to move the pouring pipe left and right; Move to the soil surface.

5) During the pouring process, the discharge port of the pouring pipe should be placed below the current pouring surface as much as possible; in other cases such as the surface being smoothed, the distance between the discharge port of the pouring pipe and the current pouring surface should not be higher than 1.5m.

Care and Maintenance

After the top surface of the light soil pouring area is poured to the design elevation, the surface should be covered with plastic film to moisturise and maintain the light soil roadbed; or non-woven geotextile covering and watering should be used for maintenance. The curing time is not less than 7 days. 

Before the top of the light soil subgrade is filled with soil, it is strictly forbidden to drive construction machinery on it; if it is unavoidable in some areas, a temporary protective layer with a thickness of not less than 50cm should be laid at a suitable position or covered with steel plates as a temporary access road for Construction machinery travels.


Connection with other processes

The top improved soil must be constructed when the maintenance strength of the light soil under the same conditions reaches 1.5MPa. During construction, it is strictly forbidden for large machinery such as dump trucks, road rollers, and bulldozers to directly walk on the top surface of the light soil. Paving and rolling are carried out in the forward way of leveling and rolling, that is, unloading trucks and road rollers should unload and walk at the rear end of the leveling machine.


During the rainy season, special measures should be taken to prevent and drain the water and soil, especially to prevent water and soil loss. Measures such as film covering and setting of temporary drainage ditches should be adopted to avoid slope erosion and prevent a large amount of water and soil from flowing to the lower light soil pouring surface for pollution. Light soil.


TRUNNANO is a concrete additives supplier with over 12 years experience in nano-building energy conservation and nanotechnology development. We accept payment via Credit Card, T/T, West Union and Paypal. Trunnano will ship the goods to customers overseas through FedEx, DHL, by air, or by sea.

If you are looking for high quality foaming agent, please feel free to contact us and send an inquiry.

sales@cabr-concrete.com


Southern Copper Corp (SCCO.N) recently said its Peruvian mine remained closed after a six-week standoff with protesters and blamed the Peruvian government for failing to intervene in the safety of its 1,300 workers and their families.  

The company said in a statement that a recent agreement to end protests at the Cuajone mine required the company to withdraw complaints against protest leaders because railways transporting minerals and supplies remained blocked. Production has been suspended since the end of February.  

Peru's Energy Ministry said in a separate statement that it had also reached an agreement with Southern Copper to start talks to find common ground with local communities.  

"If we shut down for a year, the government will stop receiving more than 3.1 billion soles ($830 million) in taxes and royalties, and 8,000 direct and indirect jobs will be lost. This is what we want to avoid, "Southern Copper added in the statement.

Peru has faced a wave of protests from indigenous communities, who accuse mining companies of not providing enough jobs and funding to poor local residents.  

Central bank officials said last week that protests against copper mines such as MMG's Las Bambas and Southern Copper's Cuajone were dragging down the economy.  

Peru is the world's second-largest copper producer and mining is an important source of tax revenue for the country. It is estimated that the supply and prices of the Foam Lightweight will be influenced by that.

Inquiry us

Our Latest Stearic Acid Series

Difference Between Silicon Carbide SiC and Boron Carbide B4C

The main difference between silicon carbide and boron carbide is that in silicon carbide one silicon atom bonds to one carbon atom, whereas in boron carbide four boron atoms bond to one carbon atom.…

Construction Precautions for Foam Lightweight Soil

The filling elevation of the foam light soil with different strengths shall be constructed in strict accordance with the design requirements. The anti-seepage geomembrane on the top of the foam light soil subgrade shall be laid under the metal mesh,…

Foam Cement Construction Process

This article introduces how to make foam cement and how to choose materials including cement and foaming agent.…